Schedule 70.3

IT IS ORDERED, pursuant to the provisions of the Provincial Offences Act and the rules for the Ontario Court of Justice, that the amount set opposite each of the offences in the attached Items of Schedule 70.3 under the Provincial Statutes and Regulations thereunder is the Set Fine.

This Order comes into effect on the 14th day of April 2011.

DATED AT TORONTO this 14th day of April 2011.

ORIGINAL SIGNED BY:

Annemarie E. Bonkalo, Chief Justice
Ontario Court of Justice

Schedule 70.3
Oil, Gas and Salt Resources Operating Standards incorporated by reference into Ontario Regulation 245/97
(Exploration, Drilling and Production) under the Oil, Gas and Salt Resources Act
Item Column 1 Column 2
Section
Set Fine Previous Set Fine
0.1 Fail to ensure all equipment used in drilling a well is in good condition and adequate 3.1 (a) $500.00 None (New Item)
0.2 Fail to prevent the migration of oil, gas or water from one horizon to another 3.1 (b) $750.00 None (New Item)
0.3 Fail to properly handle or dispose of all fluids produced or recovered 3.1 (c) $500.00 None (New Item)
0.4 Fail to properly handle or dispose of fluids or refuse from a well 3.1 (d) $500.00 None (New Item)
1. Drill a well with a surface location in a restricted drilling area 3.1.1 $400.00 None (New Item)
2. Fail to construct sumps or pits or to provide tanks prior to spudding 3.2 $400.00 None (New Item)
3. Fail to install temporary fencing around sump 3.2.1 (a) $200.00 None (New Item)
4. Fail to install a impervious liner 3.2.1 (b) $200.00 None (New Item)
5. Fail to maintain fluid levels 0.5 metres below base of dike 3.2.1 (c) $200.00 None (New Item)
6. Fail to use proper liner in earthen sump or pit 3.2.2 $200.00 None (New Item)
7. Fail to close earthen sump or pit within 6 months of TD date 3.3 $500.00 None (New Item)
8. Fail to isolate formations from contamination caused by migration of fluids 3.4 (c) $750.00 None (New Item)
9. Fail to prevent migration of fluids to surface or sub-surface 3.4 (d) $750.00 None (New Item)
10. Fail to prevent shale and unconsolidated material from falling into open hole during drilling 3.4 (e) $250.00 None (New Item)
11. Improper removal of casing during drilling 3.5.1 $450.00 None (New Item)
12. Improper removal of casing from a producing well 3.5.1.1 $450.00 None (New Item)
13. Fail to have proper hole size for casing when sealing well 3.5.2 $250.00 None (New Item)
14. Fail to have proper annular clearance between casings 3.5.3 $250.00 None (New Item)
15. Fail to record history of used casing 3.6 (a) $400.00 None (New Item)
16. Fail to examine condition of thread on pipe and inside collars of used casings 3.6 (b) $400.00 None (New Item)
17. Fail to examine condition of pipe near threads and casing collars of used casings 3.6 (c) $400.00 None (New Item)
18. Fail to conduct wall thickness measurements on joints of used casings 3.6 (d) $400.00 None (New Item)
19. Fail to conduct a hydrostatic pressure test on used casings 3.6 (e) $400.00 None (New Item)
20. Fail to guide casing properly into hole 3.7 (a) $250.00 None (New Item)
21. Fail to apply correct casing torque or thread standoff 3.7 (b) $250.00 None (New Item)
22. Fail to clean threads and examine casing 3.7 (c) $250.00 None (New Item)
23. Fail to examine and clear casing of internal obstructions 3.7 (d) $250.00 None (New Item)
24. Fail to use thread compound on casing joints 3.7 (e) $250.00 None (New Item)
25. Fail to pressure test all joints in the string 3.7 (f) $250.00 None (New Item)
26. Fail to protect all potable water formations 3.9 (a) $700.00 None (New Item)
27. Fail to protect potential hydrocarbon-bearing zones 3.9 (b) $700.00 None (New Item)
28. Fail to protect casings from fluid bearing formations 3.9 (c) $400.00 None (New Item)
28.1 Fail to meet cement quality 3.9.2(a) $750.00 None (New Item)
28.2 Fail to comply with API publication for selecting correct cement grade 3.9.2(b) $750.00 None (New Item)
28.3 Fail to ensure cement correctly mixed and pumped 3.9.2(b) $500.00 None (New Item)
29. Fail to ensure cement quality by providing Examiner on site 3.9.2 (c) $450.00 None (New Item)
30. Fail to run conductor casing where water flows occur close to surface 3.10 $450.00 None (New Item)
31. Fail to ensure conductor casing is of sufficient weight and quality 3.10.1 (a) $450.00 None (New Item)
32. Fail to ensure hole is dry and monitored prior to resumption of drilling 3.10.1 (b) $450.00 None (New Item)
33. Fail to squeeze cement to isolate fresh water zone where water flow not stopped 3.10.1 (c) $450.00 None (New Item)
34. Recover conductor casing prior to cementing next string 3.10.1 (d) $450.00 None (New Item)
35. Fail to permanently isolate and protect potable water 3.11 (a) $500.00 None (New Item)
36. Fail to prevent cross-flow between fluid bearing zones 3.11 (b) $500.00 None (New Item)
37. Fail to prevent sloughing of unconsolidated material into well bore 3.11 (c) $500.00 None (New Item)
38. Fail to anchor well control equipment 3.11 (d) $500.00 None (New Item)
39. Fail to cement surface casing 3.11.1 $500.00 None (New Item)
40. Fail to drill surface hole sufficiently deep into bedrock 3.11.2 $500.00 None (New Item)
41. Fail to run a string of casing above the artesian fresh water zone 3.11.3 $500.00 None (New Item)
42. Fail to cement surface casing before drilling 3.11.4 $500.00 None (New Item)
43. Fail to cement surface casing full length 3.11.4 (a) $500.00 None (New Item)
44. Fail to use proper excess cement volume 3.11.4 (b) $500.00 None (New Item)
45. Fail to cement surface casing using circulation method 3.11.4 (c) $500.00 None (New Item)
46. Fail to monitor annular flow for cement returns 3.11.5 $500.00 None (New Item)
47. Fail to ensure surface casing cement complies with API Specification 10 3.11.6 $500.00 None (New Item)
48. Fail to ensure surface casing cement retains 5 metres of tail cement 3.11.7 $500.00 None (New Item)
49. Fail to pre-flush before pumping cement into casing 3.11.8 $500.00 None (New Item)
50. Fail to obtain slurry samples during cementing operation 3.11.9 $500.00 None (New Item)
51. Fail to determine WOC (Wait on Cement) time 3.11.10 $500.00 None (New Item)
52. Commence drill-out operation before cement attains 3600 kPa compressive strength 3.11.10 $500.00 None (New Item)
53. Fail to conduct casing pressure test before cement drilled out of shoe joint 3.11.11 $500.00 None (New Item)
54. Fail to conduct remedial work if casing fails pressure test 3.11.11 $500.00 None (New Item)
55. Fail to conduct pressure integrity test 3.11.12 $500.00 None (New Item)
56. Fail to use a low volume, high pressure pump for pressure integrity test 3.11.12 (a) $500.00 None (New Item)
57. Apply incorrect pressure during pressure integrity test 3.11.12 (a) $500.00 None (New Item)
58. Fail to conduct pressure integrity test for ten minutes 3.11.12 (b) $500.00 None (New Item)
59. Fail to use an incompressible fluid in pressure integrity test 3.11.12 (c) $500.00 None (New Item)
60. Fail to record test data in pressure integrity test 3.11.12 (d) $500.00 None (New Item)
61. Fail to conduct remedial work when casing seat fails pressure integrity test 3.11.13 $500.00 None (New Item)
62. Fail to use intermediate casing and cement to protect equipment and formations from excessive pressures 3.12 (a) $500.00 None (New Item)
63. Fail to use intermediate casing and cement to prevent fluid migration 3.12 (b) $500.00 None (New Item)
64. Fail to use intermediate casing and cement to prevent material from falling into open hole 3.12 (c) $500.00 None (New Item)
65. Fail to control the target zone pressure 3.12 (d) $500.00 None (New Item)
66. Fail to set and cement intermediate casing prior to drilling 3.12.1 $500.00 None (New Item)
67. Fail to cement casing when aquifer is present 3.12.2 $500.00 None (New Item)
68. Fail to identify all oil, gas and fluid bearing zones when drilling 3.12.3 (a) $500.00 None (New Item)
69. Fail to pump cement to separate all oil, gas and fluid bearing zones 3.12.3 (b) $500.00 None (New Item)
70. Fail to ensure cement in casing annulus rises 25 metres above previous casing seat 3.12.3 (c) $500.00 None (New Item)
71. Fail to provide an Examiner to certify isolation of all porous zones 3.12.3 (d) $550.00 None (New Item)
72. Fail to seal or plug the lost circulation zone prior to or during the cementing of the casing 3.12.4 $500.00 None (New Item)
73. Fail to cement by circulation method to 25 metres above last casing seat 3.12.5 $500.00 None (New Item)
74. Fail to conduct remedial cementing to isolate all porous zones 3.12.5.1 $500.00 None (New Item)
75. Fail to utilize correct cement volume 3.12.6 $500.00 None (New Item)
76. Fail to use sulphate-resistant casing cement 3.12.7 $500.00 None (New Item)
77. Fail to run 5 metre long shoe joint 3.12.8 $500.00 None (New Item)
78. Fail to wait on cement for 6 hours before starting drill-out operation 3.12.9 $500.00 None (New Item)
79. Fail to conduct casing pressure test before cement drilled out of shoe joint 3.12.10 $500.00 None (New Item)
80. Fail to conduct a low pressure test before cement drilled out of shoe joint 3.12.10 (a) $500.00 None (New Item)
81. Fail to conduct a high pressure test before cement drilled out of shoe joint 3.12.10 (b) $500.00 None (New Item)
82. Fail conduct remedial work where casing fails pressure test 3.12.10 $500.00 None (New Item)
83. Fail to install and test spool, casing valve and BOP equipment with intermediate casing string 3.12.11 $500.00 None (New Item)
84. Fail to conduct pressure integrity test after drilling cement in shoe joint 3.12.12 $650.00 None (New Item)
85. Fail to use low volume, high pressure pump in pressure integrity test 3.12.12 (a) $650.00 None (New Item)
86. Fail to apply proper pressure on formation in pressure integrity test 3.12.12 (b) $650.00 None (New Item)
87. Fail to apply pressure for 10 minutes in pressure integrity test 3.12.12 (c) $650.00 None (New Item)
88. Fail to use incompressible fluid in pressure integrity test 3.12.12 (d) $650.00 None (New Item)
89. Fail to record type and gradient of incompressible fluid in pressure integrity test 3.12.12 (e) (i) $200.00 None (New Item)
90. Fail to record duration of pressure integrity test 3.12.12 (e) (ii) $200.00 None (New Item)
91. Fail to record initial pressure in pressure integrity test 3.12.12 (e) (iii) $200.00 None (New Item)
92. Fail to record final pressure in pressure integrity test 3.12.12 (e) (iv) $200.00 None (New Item)
93. Fail to protect equipment and formations with cemented production casing 3.13 $400.00 None (New Item)
93.1 Fail to run a gamma ray log within 30 days of well’s TD date 3.13.1(a) $700.00 None (New Item)
93.2 Fail to run a neutron log within 30 days of well’s TD date 3.13.1(b) $700.00 None (New Item)
93.3 Fail to install all wellhead equipment in compliance with API Spec 6A 3.13.2 $700.00 None (New Item)
94. Fail to install a well control device capable of closing around the cable prior to drilling 3.13.4 (a) (i) $700.00 None (New Item)
95. Fail to install a well control device with remote controls 3.13.4 (a) (ii) $700.00 None (New Item)
96. Fail to perform daily function test of well control device 3.13.4 (b) $500.00 None (New Item)
97. Fail to ensure all lubricator components can handle pressure 3.13.4 (c) $500.00 None (New Item)
98. Fail to specify when lubricator system is employed 3.13.4 (d) $500.00 None (New Item)
99. Fail to use full lubricator system 3.13.4 (e) $500.00 None (New Item)
100. Fail to properly install rotary head to BOP system 3.13.5 $500.00 None (New Item)
101. Fail to cement production casing 25 metres above previous casing seat 3.13.6 $500.00 None (New Item)
102. Fail to cement production casing 25 metres above corrosive zone 3.13.6 (a) $500.00 None (New Item)
103. Fail to cement production casing liner over its full length 3.13.6 (b) $500.00 None (New Item)
104. Fail to cement production casing to surface in wells located in water-covered areas 3.13.6 (d) $500.00 None (New Item)
105. Fail to provide an Examiner to certify cement tops 3.13.6 $450.00 None (New Item)
106. Fail to isolate porous zones by remedial cementing 3.13.6.1 $400.00 None (New Item)
107. Fail to use 30 per cent excess volume of cement based on theoretical calculation 3.13.7 (a) $400.00 None (New Item)
108. Fail to use 20 per cent excess volume of cement based on calliper volume determination 3.13.7 (b) $400.00 None (New Item)
109. Fail to use proper quality and temperature of water when mixing cement 3.13.8 (a) $400.00 None (New Item)
110. Fail to run a 5 metre casing shoe joint to retain tail cement 3.13.8 (b) $400.00 None (New Item)
111. Fail to cement by displacement method and use a wiper plug to separate cement 3.13.9 (a) $400.00 None (New Item)
112. Fail to provide a positive stop to cement displacement 3.13.9 (b) $400.00 None (New Item)
113. Fail to remove drilling fluid and filter cake and improve cement bond 3.13.9 (c) $400.00 None (New Item)
114. Fail to use wall cleaners or scratchers to improve cement bond 3.13.9 (d) $400.00 None (New Item)
115. Fail to run centralizers at proper locations 3.13.10 $400.00 None (New Item)
116. Fail to pump sufficient volume of neat tail cement 3.13.11 (a) $400.00 None (New Item)
117. Fail to ensure tail cement is equal in quality to neat cement 3.13.11 (b) $400.00 None (New Item)
118. Fail to use remedial cementing techniques where potential for hydrostatic communication between formations 3.13.12 $400.00 None (New Item)
119. Fail to retain records of remedial cementing 3.13.13 $200.00 None (New Item)
119.1 Fail to run cement bond log 3.13.13 $700.00 None (New Item)
119.2 Fail to comply with API Spec 6A for surface equipment 3.14 $700.00 None (New Item)
120. Fail to install a casing head or spool prior to completing well 3.14 (a) $400.00 None (New Item)
121. Fail to provide a wellhead to isolate the annulus at surface prior to completing well 3.14 (b) $400.00 None (New Item)
122. Fail to install a tubing head or tubing spool prior to completing well 3.14 (c) $400.00 None (New Item)
123. Drilling and cementing records — fail to keep on file the size, type, grade and weight of casing 3.15 (a) $200.00 None (New Item)
124. Drilling and cementing records — fail to keep on file the names of the manufacturer and supplier 3.15 (b) $200.00 None (New Item)
125. Drilling and cementing records — fail to keep on file a casing tally 3.15 (c) $200.00 None (New Item)
126. Drilling and cementing records — fail to keep on file whether casing was new or used 3.15 (d) $200.00 None (New Item)
127. Drilling and cementing records — fail to keep on file the history of use for used casing 3.15 (e) $200.00 None (New Item)
128. Drilling and cementing records — fail to keep on file the setting depth 3.15 (f) $200.00 None (New Item)
129. Drilling and cementing records — fail to keep on file  description of operational problems while running casing 3.15 (g) $200.00 None (New Item)
130. Drilling and cementing records — fail to keep on file the cementing company name 3.16 (a) $200.00 None (New Item)
131. Drilling and cementing records — fail to keep on file the cement blends used 3.16 (b) $200.00 None (New Item)
132. Drilling and cementing records — fail to keep on file the source of mix water 3.16 (c) $200.00 None (New Item)
133. Drilling and cementing records — fail to keep on file type and volume of any preflush 3.16 (d) $200.00 None (New Item)
134. Drilling and cementing records — fail to keep on file volumes of cement 3.16 (e) $200.00 None (New Item)
135. Drilling and cementing records — fail to keep on file cement slurry density 3.16 (f) $200.00 None (New Item)
136. Drilling and cementing records — fail to keep on file actual displacement volume 3.16 (g) $200.00 None (New Item)
137. Drilling and cementing records — fail to keep on file final displacement pressure 3.16 (h) $200.00 None (New Item)
138. Drilling and cementing records — fail to keep on file any cement movement techniques 3.16 (i) $200.00 None (New Item)
139. Drilling and cementing records — fail to keep on file cement returns with estimate of volume 3.16 (j) $200.00 None (New Item)
140. Drilling and cementing records — fail to keep on file float equipment and casing attachments 3.16 (k) $200.00 None (New Item)
141. Drilling and cementing records — fail to keep on file results of every pressure test 3.16 (l) $200.00 None (New Item)
142. Drilling and cementing records — fail to keep on file cement tops and their identification 3.16 (m) $200.00 None (New Item)
143. Drilling and cementing records — fail to keep on file description of any operational problems 3.16 (n) $200.00 None (New Item)
144. Drilling and cementing records — fail record and keep on file a copy of cement bond logs 3.16 (o) $200.00 None (New Item)
145. Fail to keep on site records that include depth at start of day or shift 3.17 (a) $200.00 None (New Item)
146. Fail to keep on site records that include depth at end of day or shift 3.17 (b) $200.00 None (New Item)
147. Fail to keep on site records that include diameter of the hole 3.17 (c) $200.00 None (New Item)
148. Fail to keep on site records that include any change in casing program 3.17 (d) $200.00 None (New Item)
149. Fail to keep on site records that include setting depth, casing size, type, grade and weight 3.17 (e) $200.00 None (New Item)
150. Fail to keep on site records that include new or used casing 3.17 (f) $200.00 None (New Item)
151. Fail to keep on site records that include a description of all cement jobs 3.17 (g) $200.00 None (New Item)
152. Fail to keep on site records that include pressure tests and results 3.17 (h) $200.00 None (New Item)
153. Fail to keep on site records that include the depth of all shows of oil, gas or water 3.17 (i) $200.00 None (New Item)
154. Fail to keep on site records that include the depth of lost circulation zones 3.17 (j) $200.00 None (New Item)
155. Fail to keep on site records that include a description of related operations 3.17 (k) $200.00 None (New Item)
156. Drilling samples — fail to collect at 3 metre intervals from vertical or deviated portion of wellbore 3.18 (a) (i) $250.00 None (New Item)
157. Drilling samples — fail to collect at 6 metre intervals from horizontal portion of wellbore 3.18 (a) (ii) $250.00 None (New Item)
158. Drilling samples — fail to bag, dry and label sample bags 3.18 (b) (i) $250.00 None (New Item)
159. Drilling samples — fail to wash, dry and label sample vials 3.18 (b) (ii) $250.00 None (New Item)
160. Drilling samples — fail to provide samples recovered from a well 3.18 (c) $250.00 None (New Item)
161. Site rehabilitation — fail to clear area around well of all refuse material 3.19 (a) $700.00 None (New Item)
162. Site rehabilitation — fail to dispose of all liquid and solid waste in a safe manner 3.19 (b) $700.00 None (New Item)
163. Site rehabilitation — fail to fill in excavations 3.19 (c) $700.00 None (New Item)
164. Site rehabilitation — fail to clean pits of salt and chemicals that inhibit plant growth 3.19 (d) $700.00 None (New Item)
165. Site rehabilitation — fail to remove concrete bases, machinery and materials 3.19 (e) $500.00 None (New Item)
166. Site rehabilitation — fail to level and restore site to original condition 3.19 (f) $500.00 None (New Item)
167. Site rehabilitation — fail to provide an Examiner to visit site and certify rehabilitation and plugging properly completed 3.19 (g) $450.00 None (New Item)
167.1 Commence drilling in Lake Erie prior to April 1 or after October 31 3.20 (a) N.S.F. None (New Item)
168. Water covered area — fail to cement all casings to lake bed 3.20 (b) $700.00 None (New Item)
169. Water covered area — fail to monitor for oil and liquid hydrocarbons 3.20 (c) $500.00 None (New Item)
170. Water covered area — fail to use fresh water drilling fluids only 3.20 (e) $500.00 None (New Item)
171. Water covered area — fail to have onboard tanks to contain all drilling fluids 3.20 (f) $500.00 None (New Item)
172. Water covered area — fail to reduce turbidity when returning drill cuttings to lake bed 3.20 (g) $400.00 None (New Item)
173. Water covered area — fail to prepare and submit contingency plan 3.20.1 $400.00 None (New Item)
174. Water covered area — fail to include emergency definitions in contingency plan 3.20.1 (a) $400.00 None (New Item)
175. Water covered area — fail to include written instructions for response and mitigation in contingency plan 3.20.1 (b) $400.00 None (New Item)
176. Water covered area — fail to include emergency response organizations and responsibilities for actions in contingency plan 3.20.1 (c) $400.00 None (New Item)
177. Water covered areas — fail to include locations, access routes or directions to all works in contingency plan 3.20.1 (d) $400.00 None (New Item)
178. Water covered areas — fail to list resources, supplies and equipment required for response and mitigation in contingency plan 3.20.1 (e) $400.00 None (New Item)
179. Water covered areas — fail to include contact lists for personnel, public bodies and equipment suppliers in contingency plan 3.20.1 (f) $400.00 None (New Item)
180. Water covered areas — fail to include incident assessment and reporting procedures in contingency plan 3.20.1 (g) $400.00 None (New Item)
181. Water covered areas — fail to conduct regular emergency response drills 3.20.2 $400.00 None (New Item)
182. Fail to install and maintain adequate BOP equipment during drilling 4.1 $700.00 None (New Item)
183. Fail to have proper flanges on casing bowl or spool to which BOP attached 4.4.1 (a) $700.00 None (New Item)
184. Fail to have at least one valve on casing bowl or spool to which BOP equipment attached 4.4.1 (b) $700.00 None (New Item)
185. Fail to connect BOP to an accumulator system where hydraulic operation 4.4.3 $400.00 None (New Item)
186. Fail to locate wheel used to close blowout preventer 5 metres from rig floor and to secure shaft to preventer where mechanical operation of BOP 4.4.4 $400.00 None (New Item)
187. Fail to install and operate accumulator system to manufacturer’s specifications 4.4.5 (a) $400.00 None (New Item)
188. Fail to ensure accumulator can provide fluid of sufficient volume and pressure 4.4.5 (b) $400.00 None (New Item)
189. Fail to connect accumulator properly to BOP 4.4.5 (c) $400.00 None (New Item)
190. Fail to ensure accumulator system is recharged by pump 4.4.5 (d) $400.00 None (New Item)
191. Fail to ensure accumulator system can close ram blowout preventer within 30 seconds 4.4.5 (e) $400.00 None (New Item)
192. Fail to ensure accumulator system can close annular blowout preventer within 90 seconds 4.4.5 (f) $400.00 None (New Item)
193. Fail to ensure accumulator system is equipped with gauges 4.4.5 (g) $400.00 None (New Item)
194. Fail to ensure accumulator system is equipped with check valve 4.4.5 (h) $400.00 None (New Item)
195. Fail to ensure nitrogen supply is connected to accumulator system 4.4.6 $400.00 None (New Item)
196. Fail to have adequate nitrogen supply 4.4.6 (a) $400.00 None (New Item)
197. Fail to maintain nitrogen supply at 12,500 kPa 4.4.6 (b) $400.00 None (New Item)
198. Fail to install or have available pressure gauge to measure nitrogen pressure 4.4.6 (c) $400.00 None (New Item)
199. Fail to install hand wheels on ram preventers 4.4.7 $400.00 None (New Item)
200. Fail to install operating controls for hydraulically operated BOP system 4.4.8 $400.00 None (New Item)
201. Kill systems — fail to install an inlet below BOP 4.4.9 $400.00 None (New Item)
202. Kill systems — fail to install proper size inlet below BOP 4.4.9 (a) $400.00 None (New Item)
203. Kill systems — fail to install nipple, valve and kill line for Class B wells 4.4.9 (b) $400.00 None (New Item)
204. Kill systems — fail to install kill line components with proper pressure rating 4.4.9 (c) $400.00 None (New Item)
205. Kill systems — fail to install separate lines for kill fluids 4.4.9 (d) $400.00 None (New Item)
206. Bleed-off system — fail to install bleed-off outlet below BOP 4.4.10 $400.00 None (New Item)
207. Bleed-off system — fail to install proper size outlet 4.4.10 (a) $400.00 None (New Item)
208. Bleed-off system — fail to install proper nipple, valve and bleed-off line for Class B wells 4.4.10 (b) $400.00 None (New Item)
209. Bleed-off system — fail to have proper pressure rating for bleed-off line 4.4.10 (c) $400.00 None (New Item)
210. Bleed-off system — fail to attach separate lines to named equipment 4.4.10 (d) $400.00 None (New Item)
211. Flexible hose — fail to install hose with proper pressure rating 4.4.11 (a) $400.00 None (New Item)
212. Flexible hose — fail to install hose with proper internal diameter 4.4.11 (b) $400.00 None (New Item)
213. Flexible hose — fail to install hose  with factory installed connections 4.4.11 (c) $400.00 None (New Item)
214. Flexible hose — fail to install hose with adequate fire protection sheath 4.4.11 (d) $400.00 None (New Item)
215. Flexible hose — fail to install hose with manufacturer’s identification 4.4.11 (e) $400.00 None (New Item)
216. Flexible hose — fail to install flexible hose with bends equal to or greater than manufacturer’s specifications 4.4.11 (f) $400.00 None (New Item)
217. Flexible hose — fail to secure flexible hose 4.4.11 (g) $400.00 None (New Item)
218. Flexible hose — fail to shop service and test 4.4.11 (h) $400.00 None (New Item)
219. Flexible hose — fail to record test and maintenance data 4.4.11 (h) $400.00 None (New Item)
220. Fail to conduct a pressure test prior to drilling cement out 4.4.12 $400.00 None (New Item)
221. Fail to test BOP equipment daily 4.4.13 $700.00 None (New Item)
222. Fail to service defective BOP equipment 4.4.13 $700.00 None (New Item)
223. Fail to shop service BOP equipment every 3 years 4.4.14 $700.00 None (New Item)
224. Fail to record test and maintenance data of BOP equipment 4.4.14 $400.00 None (New Item)
225. Training — fail to ensure rig crew is trained 4.4.15 (a) $700.00 None (New Item)
226. Training — fail to ensure that driller is certified 4.4.15 (b) $700.00 None (New Item)
227. Training — fail to ensure that at least one person is certified 4.4.15 (c) $700.00 None (New Item)
228. Training — fail to ensure that BOP drills are performed prior to drilling 4.4.15 (d) $400.00 None (New Item)
229. Training — fail to ensure that BOP drills are performed every seven days 4.4.15 (e) $400.00 None (New Item)
230. Training — fail to ensure that BOP drills are recorded 4.4.15 (f) $400.00 None (New Item)
231. Training — fail to post kick control procedures at rig 4.4.15 (g) $400.00 None (New Item)
232. Fail to use Class A well BOP equipment 4.5.1 (a) $500.00 None (New Item)
233. Fail to use Class B well BOP equipment 4.5.1 (b) $500.00 None (New Item)
234. Fail to properly construct drilling-through components 4.5.2 $400.00 None (New Item)
235. Fail to have flange as part of casing bowl 4.5.3 (a) $400.00 None (New Item)
236. Fail to ensure casing bowl has one valve 4.5.3 (b) $400.00 None (New Item)
237. Fail to ensure blowout preventer is hydraulically operated 4.5.4 $400.00 None (New Item)
238. Fail to install and operate accumulator system to manufacturer’s specifications 4.5.5 (a) $400.00 None (New Item)
239. Fail to ensure accumulator system maintains pressure 4.5.5 (b) $400.00 None (New Item)
240. Fail to ensure accumulator system is connected to blowout preventers 4.5.5 (c) $400.00 None (New Item)
241. Fail to ensure accumulator system is recharged by automatic pump 4.5.5 (d) $400.00 None (New Item)
242. Fail to ensure accumulator system can close ram blowout preventer 4.5.5 (e) $400.00 None (New Item)
243. Fail to ensure accumulator system can close annular blowout preventer 4.5.5 (f) $400.00 None (New Item)
244. Fail to ensure accumulator system can close annular blowout preventer 4.5.5 (g) $400.00 None (New Item)
245. Fail to ensure accumulator system is equipped with fittings and gauges 4.5.5 (h) $400.00 None (New Item)
246. Fail to connect accumulator to nitrogen supply 4.5.6 $400.00 None (New Item)
247. Fail to have adequate nitrogen supply to operate BOP equipment 4.5.6 (a) $400.00 None (New Item)
248. Fail to have nitrogen supply at 12,500 kPa 4.5.6 (b) $400.00 None (New Item)
249. Fail to install or have available gauge to measure nitrogen pressure 4.5.6 (c) $400.00 None (New Item)
250. Fail to have hand wheels for ram type blowout preventers 4.5.7 $400.00 None (New Item)
251. Fail to include operating controls for each blowout preventer 4.5.8 (a) $400.00 None (New Item)
252. Fail to include additional controls to close and open valve 4.5.8 (b) (i) $400.00 None (New Item)
253. Fail to include additional controls 15 metres from well 4.5.8 (b) (ii) $400.00 None (New Item)
254. Fail to include readily accessible and protected additional controls 4.5.8 (b) (iii) $400.00 None (New Item)
255. Fail to include a kill system 4.5.9 $400.00 None (New Item)
256. Fail to have proper pressure rating of kill system 4.5.9 (a) $400.00 None (New Item)
257. Fail to include kill line connecting mud line to drilling spool 4.5.9 (b) $400.00 None (New Item)
258. Fail to include a valved kill system to isolate kill line from stand pipe 4.5.9 (c) $400.00 None (New Item)
259. Fail to include kill system with two flanged valves on drilling spools 4.5.9 (d) $400.00 None (New Item)
260. Fail to include kill system with 50 millimetres diameter 4.5.9 (e) $400.00 None (New Item)
261. Fail to install flexible hose with proper pressure rating 4.5.10 (a) $400.00 None (New Item)
262. Fail to install flexible hose with proper diameter 4.5.10 (b) $400.00 None (New Item)
263. Fail to install flexible hose with proper connections 4.5.10 (c) $400.00 None (New Item)
264. Fail to install flexible hose with proper sheathing 4.5.10 (d) $400.00 None (New Item)
265. Fail to install flexible hose with proper markings 4.5.10 (e) $400.00 None (New Item)
266. Fail to install flexible hose with proper bending radius 4.5.10 (f) $400.00 None (New Item)
267. Fail to secure flexible hose 4.5.10 (g) $400.00 None (New Item)
268. Fail to shop service flex hose every 3 years 4.5.10 (h) $400.00 None (New Item)
269. Fail to record flexible hose test and maintenance data 4.5.10 (h) $400.00 None (New Item)
270. Fail to ensure Class B bleed-off system valves have proper pressure rating 4.5.11 (a) $400.00 None (New Item)
271. Fail to ensure Class B bleed-off system contains only straight pipe or 90 degree bends 4.5.11 (b) $400.00 None (New Item)
272. Fail to ensure Class B bleed-off system is securely tied down 4.5.11 (c) $400.00 None (New Item)
273. Fail to ensure Class A bleed-off system has proper line with valve 4.5.12 (a) $400.00 None (New Item)
274. Fail to ensure Class A bleed-off system has proper line to pit 30 metres from well 4.5.12 (b) $400.00 None (New Item)
275. Fail to ensure Class A bleed-off line is 75 millimetres in diameter 4.5.13 (a) $400.00 None (New Item)
276. Fail to ensure Class A bleed-off line is connected by proper flanges and unions 4.5.13 (b) $400.00 None (New Item)
277. Fail to ensure Class A bleed-off line contains 2 valves on drilling spool 4.5.13 (c) $400.00 None (New Item)
278. Fail to ensure Class A bleed-off line flexible hose conforms to standards 4.5.13 (d) $400.00 None (New Item)
279. Fail to ensure choke-manifold is properly constructed 4.5.14 (a) $400.00 None (New Item)
280. Fail to ensure choke-manifold permits flow from well to flare pit 4.5.14 (b) (i) $400.00 None (New Item)
281. Fail to ensure choke-manifold permits flow from well to lines of proper diameter 4.5.14 (b) (ii) $400.00 None (New Item)
282. Fail to ensure choke-manifold contains two adjustable chokes 4.5.14 (c) $400.00 None (New Item)
283. Fail to ensure choke-manifold is constructed with valved outlet 4.5.14 (d) $400.00 None (New Item)
284. Fail to ensure choke-manifold provides casing pressure 4.5.14 (e) $400.00 None (New Item)
285. Fail to ensure choke-manifold is constructed to provide flow paths 4.5.14 (f) $400.00 None (New Item)
286. Fail to ensure choke-manifold is located outside sub-structure 4.5.14 (g) $400.00 None (New Item)
287. Fail to ensure choke-manifold is protected from freezing 4.5.14 (h) $400.00 None (New Item)
288. Fail to ensure mud system line is connected to choke line 4.5.14.1 (a) $400.00 None (New Item)
289. Fail to ensure proper diameter of mud system line 4.5.14.1 (b) $400.00 None (New Item)
290. Fail to ensure mud system line directs flow through mud-gas separator 4.5.14.1 (c) $400.00 None (New Item)
291. Fail to ensure bleed-off line from choke manifold to flare pit is proper diameter 4.5.14.2 (a) $400.00 None (New Item)
292. Fail to ensure bleed-off line from choke manifold to flare pit is 30 meters from well 4.5.14.2 (b) $400.00 None (New Item)
293. Fail to ensure bleed-off line from choke manifold is in downward direction to earthen pit of 1 metre 4.5.14.2 (c) (i) $400.00 None (New Item)
294. Fail to ensure walls of earthen pit where choke manifold bleed-off line terminates have proper height 4.5.14.2 (c) (ii) $400.00 None (New Item)
295. Fail to ensure earthen pit where choke manifold bleed-off line terminates is shaped to contain liquid 4.5.14.2 (c) (iii) $400.00 None (New Item)
296. Fail to ensure auxiliary choke manifold bleed-off lines have proper diameter 4.5.14.3 $400.00 None (New Item)
297. Fail to install and maintain a mud-gas separator in mud tank 4.5.15 (a) $400.00 None (New Item)
298. Fail to install and maintain a warning device in mud tank 4.5.15 (b) $400.00 None (New Item)
299. Fail to equip drilling mud system with device to measure volume 4.5.16 $400.00 None (New Item)
300. Fail to ensure hole is filled with proper amount of fluid when pulling pipe from well 4.5.17 (a) $400.00 None (New Item)
301. Fail to ensure volume of fluid in hole is recorded when pulling pipe from well 4.5.17 (b) $400.00 None (New Item)
302. Fail to ensure heat is provided to blow out preventer 4.5.18 (a) $400.00 None (New Item)
303. Fail to ensure bleed-off lines are empty in cold weather 4.5.18 (b) (i) $400.00 None (New Item)
304. Fail to ensure bleed-off lines are filled with non-freezing fluid in cold weather 4.5.18 (b) (ii) $400.00 None (New Item)
305. Fail to ensure bleed-off lines are heated in cold weather 4.5.18 (b) (iii) $400.00 None (New Item)
306. Fail to install and maintain drill string safety valve and a device capable of stopping back flow 4.5.19 $400.00 None (New Item)
307. Air, gas or foam drilling — fail to install and maintain a rotating head 4.5.20 (a) (i) $400.00 None (New Item)
308. Air, gas or foam drilling — fail to install and maintain a 30 metre diverter line 4.5.20 (a) (ii) $400.00 None (New Item)
309. Air, gas or foam drilling — fail to install and maintain a reserve volume of drilling fluid 4.5.20 (a) (iii) $400.00 None (New Item)
310. Air, gas or foam drilling — fail to install and maintain a hydrogen sulphide monitor 4.5.20 (a) (iv) $400.00 None (New Item)
311. Air, gas or foam drilling — fail to flare any gas flowing from diverter line 4.5.20 (b) $400.00 None (New Item)
312. Fail to ensure pressure test on casing and ram type preventer 4.5.21 (a) $400.00 None (New Item)
313. Fail to ensure pressure test on casing, ram and annular type preventer 4.5.21 (b) $400.00 None (New Item)
314. Fail to ensure pressure test on casing, ram preventer and bleed-off manifold 4.5.21 (c) $400.00 None (New Item)
315. Fail to ensure pressure test on casing and each annular preventer 4.5.21 (d) $400.00 None (New Item)
316. Fail to cease operation when pressure tests not satisfactory 4.5.21.1 $400.00 None (New Item)
317. Fail to run a casing inspection log 4.5.22 (a) $400.00 None (New Item)
318. Fail to run a pressure test at weakest section of casing 4.5.22 (b) $400.00 None (New Item)
319. Fail to test BOP equipment daily 4.5.23 (a) $400.00 None (New Item)
320. Fail to properly test annular type BOP equipment 4.5.23 (b) $400.00 None (New Item)
321. Fail to record BOP tests 4.5.23 (c) $400.00 None (New Item)
322. Fail to service BOP equipment 4.5.24 $400.00 None (New Item)
323. Fail to ensure rig crew is trained in the operation of BOP equipment 4.5.25 (a) $700.00 None (New Item)
324. Fail to ensure driller has First Line Supervisor certificate 4.5.25 (b) $700.00 None (New Item)
325. Fail to ensure at least one person has Second Line Supervisor certificate 4.5.25 (c) $700.00 None (New Item)
326. Fail to ensure blowout prevention drills conducted prior to drilling 4.5.25 (d) $500.00 None (New Item)
327. Fail to ensure blowout prevention drills conducted every 7 days 4.5.25 (e) $500.00 None (New Item)
328. Fail to ensure drills are recorded 4.5.25 (f) $400.00 None (New Item)
329. Fail to ensure device allows circulation of fluids through drill string 4.5.26 (a) $400.00 None (New Item)
330. Fail to install remote control master valve on testing head 4.5.26 (b) $400.00 None (New Item)
331. Fail to ensure well is under control 4.6 (a) $700.00 None (New Item)
332. Fail to ensure blowout prevention is installed and maintained 4.6 (b) $500.00 None (New Item)
333. Fail to ensure blowout prevention equipment is installed to specifications 4.6 (c) $500.00 None (New Item)
334. Fail to ensure blowout prevention pressure rating is proper 4.6 (d) $500.00 None (New Item)
335. Fail to ensure ram preventers have hand wheels 4.6 (e) $400.00 None (New Item)
336. Fail to meet Class II servicing requirements 4.6 (f) $400.00 None (New Item)
337. Fail to install and operate accumulator system to manufacturers specifications 4.6.4 (a) $400.00 None (New Item)
338. Fail to connect accumulator system to preventer with lines of proper pressure 4.6.4 (b) $400.00 None (New Item)
339. Fail to ensure accumulator system is capable of providing sufficient pressure and volume 4.6.4 (c) $400.00 None (New Item)
340. Fail to ensure accumulator system is recharged by pressure controlled pump 4.6.4 (d) $400.00 None (New Item)
341. Fail to ensure accumulator capable of closing ram type preventer within 30 seconds 4.6.4 (e) $400.00 None (New Item)
342. Fail to ensure accumulator system is capable of closing annular preventer within 60 seconds 4.6.4 (f) $400.00 None (New Item)
343. Fail to ensure accumulator system is equipped with proper gauges and fittings 4.6.4 (g) $400.00 None (New Item)
344. Fail to ensure accumulator system is equipped with check valve 4.6.4 (h) $400.00 None (New Item)
345. Fail to connect accumulator system to nitrogen supply 4.6.5 $400.00 None (New Item)
346. Fail to ensure nitrogen supply provides sufficient volume and pressure 4.6.6 (a) $400.00 None (New Item)
347. Fail to ensure nitrogen supply has gauge to determine pressure 4.6.6 (b) $400.00 None (New Item)
348. Fail to have operating controls readily accessible and at 5 metres from well for Class I and II wells 4.6.7 (b) $400.00 None (New Item)
349. Fail to have an independent accumulator system with proper controls for Class III wells 4.6.8 (a) $400.00 None (New Item)
350. Fail to have additional set of controls for Class III wells 4.6.8 (b) $400.00 None (New Item)
351. Class I BOP system — fail to have diverter system with proper lines 4.6.8.1 (a) $400.00 None (New Item)
352. Class I BOP system — fail to have a shut-off valve in bottom joint of tubing 4.6.8.1 (b) $400.00 None (New Item)
353. Class I BOP system — fail to have a tubing stripper 4.6.8.1 (c) $400.00 None (New Item)
354. Class II &III BOP lines — fail to ensure lines are of steel or flexible hose 4.6.8.2 (a) $400.00 None (New Item)
355. Class II &III BOP lines — fail to have lines that are valved and of proper pressure 4.6.8.2 (b) $400.00 None (New Item)
356. Class II & III BOP lines — fail to have lines that are connected to rig pump and tank 4.6.8.2 (c) $400.00 None (New Item)
357. Class II & III BOP lines — fail to have lines that are properly fitted and connected 4.6.8.2 (d) $400.00 None (New Item)
358. Class II & III BOP lines — fail to have lines of proper diameter 4.6.8.2 (e) $400.00 None (New Item)
359. Class II & III BOP lines — fail to ensure lines are securely tied down 4.6.8.2 (f) $400.00 None (New Item)
360. Class II & III BOP manifold — fail to ensure valves and steel lines with proper pressure 4.6.9 (a) $400.00 None (New Item)
361. Class II & III BOP manifold — fail to have check valve 4.6.9 (b) $400.00 None (New Item)
362. Class II & III BOP manifold — fail to have pressure relief valve 4.6.9 (c) $400.00 None (New Item)
363. Class II & III BOP manifold — fail to install or have available accurate gauge 4.6.9 (d) $400.00 None (New Item)
364. Fail to provide accurate pressure gauge during well shut-in 4.6.10 $400.00 None (New Item)
365. Fail to maintain on a service rig a safety valve in the open position 4.6.11 $400.00 None (New Item)
366. Fail to conduct a pressure test on each preventer prior to commencing operations 4.6.12 $400.00 None (New Item)
367. Fail to conduct pressure test on preventers with pipe in the hole 4.6.13 $500.00 None (New Item)
368. Fail to ensure BOP equipment is mechanically tested daily 4.6.14 $500.00 None (New Item)
369. Fail to record tests in log book 4.6.15 $400.00 None (New Item)
370. Fail to ensure properly certified driller at site 4.6.17 (a) $700.00 None (New Item)
371. Fail to ensure rig crew is trained in operation of BOP equipment 4.6.17 (b) $700.00 None (New Item)
372. Fail to ensure that BOP drills are performed every 7 days 4.6.17 (c) $500.00 None (New Item)
373. Fail to ensure BOP drills are recorded in log book 4.6.17 (d) $400.00 None (New Item)
374. Fail to provide sufficient heat in cold weather to ensure BOP system effective 4.6.18 $400.00 None (New Item)
375. Fail to properly space equipment at well site 4.7 $400.00 None (New Item)
376. Fail to maintain orderly work site 5.1 (a) $750.00 None (New Item)
377. Fail to safely store all chemicals and fuel 5.1 (b) $750.00 None (New Item)
378. Fail to properly remove and dispose of waste and unused equipment 5.1 (c) $750.00 None (New Item)
379. Fail to properly dispose of oil field fluid produced from a well 5.1.1 (a) $750.00 None (New Item)
380. Fail to properly handle, store or dispose of any products or waste 5.1.1 (b) $750.00 None (New Item)
381. Fail to immediately remove product or waste that create a hazard 5.1.1 (c) $750.00 None (New Item)
382. Fail to dispose of and keep stimulation fluids separate from oil field fluids 5.1.1 (d) $550.00 None (New Item)
383. Fail to identify well with prominent sign 5.2 $450.00 None (New Item)
384. Fail to mark battery or production site with name of operator 5.3 (a) $450.00 None (New Item)
385. Fail to show operator’s name and emergency phone number at site 5.3 (b) $450.00 None (New Item)
386. Fail to prevent waste of oil or gas 5.4 (a) $750.00 None (New Item)
387. Fail to flare gas 5.4 (b) $450.00 None (New Item)
388. Fail to meet setback requirements 5.5 $500.00 None (New Item)
389. Locate flares less than 75 metres from buildings 5.5.1 (a) $500.00 None (New Item)
390. Locate flares less than 50 metres from pipeline, electrical lines,railway or aircraft runway 5.5.1 (b) $500.00 None (New Item)
391. Locate flares less than 30 metres from wellhead, tanks and buildings 5.5.1 (c) $500.00 None (New Item)
392. Locate flares less than 15 metres from compressors, coolers, vessels and substations 5.5.1 (d) $500.00 None (New Item)
393. Locate oil and brine tanks less than 75 metres from buildings 5.5.2 (a) $500.00 None (New Item)
394. Locate oil and brine tanks less than 30 metres from pipelines, electrical lines, pits, office or switch gear 5.5.2 (b) $500.00 None (New Item)
395. Locate oil and brine tanks less than 20 metres from wellhead, railway or road allowance 5.5.2 (c) $500.00 None (New Item)
396. Locate oil and brine tanks less than 15 metres from compressors, buildings, coolers, heaters or vessels 5.5.2 (d) $500.00 None (New Item)
397. Locate oil and brine tanks less than 1 metre from other oil and brine tanks 5.5.2 (e) $500.00 None (New Item)
398. Locate process vessel less than 60 metres from buildings 5.5.3 (a) $500.00 None (New Item)
399. Locate process vessel less than 20 metres from railway or road allowance 5.5.3 (b) $500.00 None (New Item)
400. Locate process vessel less than 15 metres from tanks, pits, wellhead or office 5.5.3 (c) $500.00 None (New Item)
401. Locate process vessel less than 10 metres from other vessels 5.5.3 (d) $500.00 None (New Item)
402. Locate process vessel 7 metres from tanks where vessel is unfired 5.5.3 (e) $500.00 None (New Item)
403. Fail to properly equip diesel engines 5.5.4 $500.00 None (New Item)
404. Fail to ensure internal combustion engine is 15 metres from well when obtaining air 5.5.4.1 $500.00 None (New Item)
405. Engine exhaust pipe — fail to prevent emergence of flame 5.5.4.2 (a) $500.00 None (New Item)
406. Engine exhaust pipe — fail to ensure pipe end is 2 metres from well 5.5.4.2 (b) $500.00 None (New Item)
406.1 Fail to store oil or oil field fluids in proper container 5.6 (a) $700.00 None (New Item)
406.2 Store oil and oil field fluids in earthen pit, pond or underground tank 5.6 (b) N.S.F. None (New Item)
407. Fluid storage tanks — fail to surround with dike or firewall of proper capacity 5.6.1 (a) $700.00 None (New Item)
408. Fluid storage tanks — insufficient permeability 5.6.1 (b) $700.00 None (New Item)
409. Fluid storage tanks — fail to maintain dike or firewall in good condition 5.6.1 (c) $500.00 None (New Item)
410. Fail to use proper above ground storage tank to store oil and brine 5.6.2 $700.00 None (New Item)
411. Fail to electrically ground above ground tank 5.6.4 (a) $500.00 None (New Item)
412. Fail to electrically ground trucks when loading/unloading 5.6.4 (b) $500.00 None (New Item)
413. Fail to comply with API RP651 for cathodically protected above ground tanks 5.6.5 $500.00 None (New Item)
414. Storage tank nameplate — fail to state construction standard 5.6.6 (a) $350.00 None (New Item)
415. Storage tank nameplate — fail to state the year built 5.6.6 (b) $350.00 None (New Item)
416. Storage tank nameplate — fail to state capacity 5.6.6 (c) $350.00 None (New Item)
417. Storage tank nameplate — fail to state fabricator 5.6.6 (d) $350.00 None (New Item)
418. Storage tank nameplate — fail to state diameter and height 5.6.6 (e) $350.00 None (New Item)
419. Piping systems — fail to use proper pipeline 5.7 $700.00 None (New Item)
420. Piping systems — fail to use proper material for pipeline fabrication and installation 5.7.1 $700.00 None (New Item)
421. Piping systems — fail to provide a certified Examiner for pipeline construction 5.7.2 $700.00 None (New Item)
422. Piping systems — fail to have proper pipeline burial depth 5.7.3 $700.00 None (New Item)
423. Pressure vessel — fail to properly install, repair, construct or inspect 5.8 $750.00 None (New Item)
424. Well flare stacks — fail to have proper height and diameter 5.9 (a) $450.00 None (New Item)
425. Well flare stacks — fail to have proper height and diameter 5.9 (b) $450.00 None (New Item)
426. Well flare stacks — fail to properly install, operate and design 5.9 (c) $450.00 None (New Item)
427. Gas compressors — fail to properly design, construct, operate and maintain 5.10.1 (a) $750.00 None (New Item)
428. Gas compressors — fail to ensure shutdown controls operate properly 5.10.1 (b) $450.00 None (New Item)
429. Gas compressors — fail to ensure shut down controls are triggered on high and low pressure 5.10.1 (c) $450.00 None (New Item)
430. Fail to ensure electrical materials conform to Electrical Code 5.11 (a) $350.00 None (New Item)
431. Fail to ensure electrical materials conform to CSA 5.11 (b) $350.00 None (New Item)
432. Fail to ensure electrical materials conform to API Standards 5.11 (c) $350.00 None (New Item)
433. Fail to ensure electrical materials conform to the Shipping Act (Canada) 5.11 (d) $350.00 None (New Item)
434. Fail to ensure electrical equipment is installed by qualified electrician 5.11.1 $350.00 None (New Item)
435. Fail to ensure pressure control, limiting and relieving equipment conform to CSA code 5.12 $350.00 None (New Item)
436. Fail to ensure that fires are safeguarded to avoid a hazard 5.13 (a) $500.00 None (New Item)
437. Fail to store explosives 150 metres from work 5.13 (b) $500.00 None (New Item)
438. Fail to provide for an Examiner to check works weekly for leaks or spills 5.14 (a) $450.00 None (New Item)
439. Fail to provide for an Examiner to check works weekly for damage 5.14 (b) $450.00 None (New Item)
440. Fail to provide for an Examiner to check works weekly for unsafe conditions 5.14 (c) $450.00 None (New Item)
441. Fail to provide for an Examiner to certify annually that works comply with Provincial Standards 5.14.1 $450.00 None (New Item)
442. Suspended wells — fail to isolate all zones from one another 5.15 (a) $600.00 None (New Item)
443. Suspended wells — fail to ensure all fresh water zones are isolated by cemented casing 5.15 (b) $600.00 None (New Item)
444. Porous and permeable fluid bearing zones — fail to isolate zones with bridge plug and cement 5.15.1 (a) $550.00 None (New Item)
445. Porous and permeable fluid bearing zones — fail to isolate zone with a bridge capped with stone and cement 5.15.1 (b) $550.00 None (New Item)
446. Porous and permeable fluid bearing zones — fail to isolate zones by alternative technique 5.15.1 (c) $550.00 None (New Item)
447. Porous and permeable fluid bearing zone — fail to ensure cementing procedures and design complies with Provincial Standards 5.15.1 (d) $550.00 None (New Item)
448. Suspended well onshore — fail to have two bull-plugged valves 5.15.2 (a) $400.00 None (New Item)
449. Suspended well onshore — fail to install two valve and bull-plugged side outlets 5.15.2 (b) $400.00 None (New Item)
450. Suspended well onshore — fail to isolate the intermediate casing annulus before suspending well 5.15.2 (c) $400.00 None (New Item)
451. Suspended well onshore — fail to provide access to a two-valved bull plug at annulus 5.15.2 (d) $400.00 None (New Item)
452. Suspended well onshore — fail to protect wellhead with steel posts or fencing 5.15.2 (e) $400.00 None (New Item)
453. Suspended well onshore — fail to remove valve handles or install lock and chain 5.15.3 (a) $400.00 None (New Item)
454. Suspended well onshore — fail to enclose well site with building or chain-link fence 5.15.3 (b) $400.00 None (New Item)
455. Suspended well onshore — fail to inspect wellhead and valves for leaks 5.15.4 $400.00 None (New Item)
456. Suspended well onshore — fail to lubricate and service wellhead valves annually 5.15.5 $400.00 None (New Item)
457. Suspended well onshore — fail to provide for an Examiner to certify well suspended properly 5.15.6 (a) $550.00 None (New Item)
458. Suspended well onshore — fail to annually examine all valve outlets for safety and integrity 5.15.6 (b) $550.00 None (New Item)
459. Site rehabilitation — fail to rehabilitate within one year of end of operations 5.16 $700.00 None (New Item)
460. Site rehabilitation — fail to dispose of all liquid and solid waste 5.16 (a) $700.00 None (New Item)
461. Site rehabilitation — fail to clean area of all debris 5.16 (b) $700.00 None (New Item)
462. Site rehabilitation — fail to drain and fill excavations 5.16 (c) $700.00 None (New Item)
463. Site rehabilitation — fail to remove surface works, concrete, machinery and materials 5.16 (d) $700.00 None (New Item)
464. Site rehabilitation — fail to level and restore grade 5.16 (e) $700.00 None (New Item)
465. Site rehabilitation — fail to provide Examiner to certify rehabilitation complies with Provincial Standards 5.16 (f) $750.00 None (New Item)
466. Water covered area — fail to ensure wellhead is properly located and encased 5.17 (a) $750.00 None (New Item)
467. Water covered area — fail to ensure wellhead is properly located in fishing area 5.17.1 $750.00 None (New Item)
468. Water covered area — fail to remove structure within 30 days of end of drilling or plugging 5.17.2 $750.00 None (New Item)
469. Water covered area — Use a platform not approved by the Ministry 5.17.3 N.S.F. None (New Item)
470. Well in water covered area — fail to mark each well and pipeline junction 5.17.4 (a) $550.00 None (New Item)
471. Well in water covered area — fail to identify operator and junction designation 5.17.4 (b) $550.00 None (New Item)
472. Well in water covered area — fail to maintain markers 5.17.4 (c) $350.00 None (New Item)
472.1 Offshore pipeline gathering system not designed, constructed or maintained in accordance with CSA Z662-99 5.17.5 N.S.F. None (New Item)
473. Fail to install metering equipment to measure tubing and casing pressure 6.1 (a) $450.00 None (New Item)
474. Fail to install metering equipment to measure flow rate 6.1 (b) $450.00 None (New Item)
475. Fail to install metering equipment to permit oil, gas or water sampling 6.1 (c) $450.00 None (New Item)
476. Fail to keep records of quantities of oil, gas and water produced 6.2 (a) $400.00 None (New Item)
477. Fail to keep records of average separator pressure 6.2 (b) $400.00 None (New Item)
478. Fail to keep records of product disposition 6.2 (c) $400.00 None (New Item)
479. Fail to keep records of purchaser and amount realized 6.2 (d) $400.00 None (New Item)
480. Fail to prevent waste of hydrocarbon resources 6.3 (a) $700.00 None (New Item)
481. Fail to prevent the waste of reservoir energy 6.3 (b) $700.00 None (New Item)
482. Fail to maximize ultimate recovery of oil and gas 6.3 (c) $700.00 None (New Item)
483. Fail to minimize flaring or venting of gas 6.3 (d) $700.00 None (New Item)
484. Fail to obtain information to optimize production and evaluate conservation 6.4 $400.00 None (New Item)
485. Fail to maintain monthly records of production volumes, reservoir pressure and fluids injected 6.4.1 $400.00 None (New Item)
486. Fail to properly meter for fluid and gas measurements 6.5 $500.00 None (New Item)
487. Fail to ensure meter accuracy for fluid and gas measurements 6.6 (a) $500.00 None (New Item)
488. Fail to ensure meter re-calibration 6.6 (b) $500.00 None (New Item)
489. Fail to report bottom hole pressure to Ministry on Form 7 6.7 $400.00 None (New Item)
490. Fail to properly determine bottom-hole pressure 6.8 $400.00 None (New Item)
491. Fail to take a gas or oil sample for each new oil pool 6.9 $400.00 None (New Item)
492. Initial production testing period report — fail to include daily production volumes on report 6.10 (a) $400.00 None (New Item)
493. Initial production testing period report — fail to include estimate of well’s potential 6.10 (b) $400.00 None (New Item)
494. Initial production testing period report — fail to include plans for gas conservation 6.10 (c) $400.00 None (New Item)
495. Initial production testing period report — fail to include evaluation, estimate and pool boundary 6.10 (d) $400.00 None (New Item)
496. Initial production testing period report — fail to include bottom hole pressure 6.10 (e) $400.00 None (New Item)
497. Fail to flare gas 6.11 $550.00 None (New Item)
498. Permit flaring in excess of permitted monthly volumes 6.11.1 $550.00 None (New Item)
498.1 Fail to produce well evenly throughout the month 6.11.3 $550.00 None (New Item)
499. Fail to contain flaring within permitted monthly volumes — same pool, 2 or more wells 6.11.4 $550.00 None (New Item)
500. Fail to take an annual shut-in pressure measurement 6.12 (a) $400.00 None (New Item)
500.1 Fail to report measurements 6.12 (b) $400.00 None (New Item)
501. Fail to report observed field data re deliverability of well to Ministry on Form 7 6.12 (c) $400.00 None (New Item)
502. Fail to take annual shut-in pressure with dead-weight gauge 6.12.1 (a) $400.00 None (New Item)
503. Fail to take annual shut-in pressure within proper time 6.12.1 (b) $400.00 None (New Item)
504. Fail to report annual shut-in pressure on Form 8 6.12.1 (c) $400.00 None (New Item)
505. Design — fail to permanently protect water formations from contamination 7 (a) $750.00 None (New Item)
506. Design — fail to protect existing formations from injected fluid 7 (b) $750.00 None (New Item)
507. Design — fail to prevent migration of fluids between formations 7 (c) $750.00 None (New Item)
508. Operation — fail to ensure that disposal fluids are compatible with disposal formation 7 (d) $750.00 None (New Item)
509. Operation — fail to ensure that disposal fluids are retained within formation 7 (e) $750.00 None (New Item)
510. Construction — fail to notify in writing landowners and operators within 750 metres 7.1 (a) $450.00 None (New Item)
511. Construction — fail to notify in writing the local municipality 7.1 (b) $450.00 None (New Item)
512. Construction — fail to notify Ministry in writing 7.1 (c) $450.00 None (New Item)
513. Design — fail to provide for injection of oil field fluid through tubing 7.2 (a) $450.00 None (New Item)
514. Design — fail to provide isolation of annular space between tubing and casing from injection zone 7.2 (b) $450.00 None (New Item)
515. Design — fail to include corrosion inhibitor 7.2 (c) $450.00 None (New Item)
516. Design — fail to provide for isolation of fresh water zones 7.2 (d) $450.00 None (New Item)
517. Design — fail to provide for cementing the surface casing 7.2 (e) $450.00 None (New Item)
518. Design — fail to provide for proper wellhead components 7.2 (f) $450.00 None (New Item)
519. Water sampling — fail to collect samples for each penetrated aquifer and record depth 7.3 (a) $400.00 None (New Item)
520. Water sampling — fail to provide a copy of the chemical analysis of water in penetrated aquifer to the Ministry 7.3 (b) $400.00 None (New Item)
521. Convert existing well 20 years or older to a disposal well 7.4.1 $750.00 None (New Item)
522. Fail to submit completed disposal report 7.5 $200.00 None (New Item)
523. Disposal operations — inject oil field fluid from another source 7.6 (a) $200.00 None (New Item)
524. Disposal operations inject liquid industrial waste 7.6 (b) $200.00 None (New Item)
525. Disposal operations — inject oil field fluid between outermost casing and well bore or annular space between strings of casing 7.6 (c) $200.00 None (New Item)
545. Fail to inject oil field fluids by gravity feed 7.7 (a) $550.00 None (New Item)
546. Fail to inject oil field fluids into formations as deep as practical 7.7 (b) $550.00 None (New Item)
547. Pre-commissioning — fail to identify wells within 750 metres 7.8 (a) $500.00 None (New Item)
548. Pre-commissioning — fail to confirm integrity of injection casing by pressure tests or cement logs 7.8 (b) $500.00 None (New Item)
548.1 Pre-commissioning — fail to run a cement bond log to verify cement integrity 7.8 (c) $750.00 None (New Item)
549. Pre-commissioning — fail to conduct injectivity test 7.8 (d) $400.00 None (New Item)
550. Pre-commissioning — fail to submit a disposal report 7.8 (e) $400.00 None (New Item)
551. Pre-commissioning — fail to submit an operating procedure 7.8 (f) $400.00 None (New Item)
552. Well within 750 metres of water well — fail to report depth of water well 7.8.1 (a) $400.00 None (New Item)
553. Well within 750 metres of water well — fail to report the age of water well 7.8.1 (b) $400.00 None (New Item)
554. Well within 750 metres of water well — fail to report volume of water taken from water well 7.8.1 (c) $400.00 None (New Item)
555. Well within 750 metres of water well — fail to report static level of water in water well 7.8.1 (d) $400.00 None (New Item)
556. Injection test — fail to submit initial test 7.9 $400.00 None (New Item)
557. Injection test — fail to include the depths of the injection intervals 7.9.1 (a) $400.00 None (New Item)
558. Injection test — fail to include the rates of injection 7.9.1 (b) $400.00 None (New Item)
559. Injection test — fail to include the injection pressures 7.9.1 (c) $400.00 None (New Item)
560. Injection test — fail to include the volume and source of fluids 7.9.1 (d) $400.00 None (New Item)
561. Injection test — fail to ensure proper pressure during initial test 7.9.2 $400.00 None (New Item)
562. Injection test — initial test more than 30 days in duration 7.9.3 (a) $400.00 None (New Item)
563. Injection test — initial test exceeds 500 m³ of injected fluid 7.9.3 (b) $400.00 None (New Item)
563.1 Commence disposal operations without written approval from the Ministry 7.10 N.S.F. None (New Item)
564. Fail to measure the volume of injected fluid and pressure 7.10.1 $400.00 None (New Item)
565. Fail to verify presence of corrosion inhibiting fluid by certified Examiner 7.10.2 $400.00 None (New Item)
566. Fail to ensure subsurface pressure does not exceed 75 per cent of fracture pressure 7.10.3 $400.00 None (New Item)
567. Fail to keep plans and maps of disposal well 7.11 $400.00 None (New Item)
568. Fail to have a spill contingency plan 7.12 $400.00 None (New Item)
569. Fail to conduct a pressure test of annular space every 5 years 7.13 $400.00 None (New Item)
570. Fail to stop injection of fluid where loss of fluid or increase in pressure 7.14 $400.00 None (New Item)
571. Fail to maintain complete records for each disposal well 7.15 $400.00 None (New Item)
583. Fail to provide for an Examiner to examine facilities semi-annually 7.16 $450.00 None (New Item)
584. Well servicing — fail to install and maintain BOP 8.1 $700.00 None (New Item)
585. Well servicing — fail to ensure proper rating on lubricator system 8.1.1 $400.00 None (New Item)
586. Well servicing — fail to ensure proper spacing of equipment 8.2 $400.00 None (New Item)
587. Well servicing — fail to install pressure gauge to determine well annulus pressure 8.3 $400.00 None (New Item)
588. Well servicing — fail to maintain stabbing valve in open position 8.5 $400.00 None (New Item)
589. Well servicing — fail to use a stub lubricator system 8.6 $400.00 None (New Item)
590. Well servicing — fail to properly ground electrical system 8.7 $400.00 None (New Item)
591. Well servicing — fail to keep a record of all servicing on well 8.10 $400.00 None (New Item)
591.1 Fail to design and construct salt solution mine as required 9.1 N.S.F. None (New Item)
592. Fail to ensure mining operations are 150 metres from operator’s property boundary 9.5 (b) $700.00 None (New Item)
593. Fail to ensure salt extraction is 50 metres from operator’s property boundary 9.5 (c) $700.00 None (New Item)
594. Fail to ensure caverns and galleries have tight hydraulic control 9.5.1 $700.00 None (New Item)
595. Fail to employ a blanketing material for roof control 9.6 $700.00 None (New Item)
596. Drilling — fail to cement to surface all casings 9.7 (a) $700.00 None (New Item)
597. Drilling — fail to set production casing 3 metres into salt formation 9.7 (b) $700.00 None (New Item)
598. Drilling — fail to include a cement bond log and casing evaluation log 9.7 (c) (i) $700.00 None (New Item)
599. Drilling — fail to conduct pressure test on production casing and seat 9.7 (c) (ii) $700.00 None (New Item)
600. Drilling — fail to conduct pressure test of the formation below production casing seat 9.7 (c) (iii) $700.00 None (New Item)
601. Drilling — hanging tubing string does not comply with API standard 9.7 (d) $700.00 None (New Item)
601.1 Fail to carry out solution mining operations in accordance with written mining plan 9.8 N.S.F. None (New Item)
602. Operation and monitoring — no operating and maintenance procedures 9.8.1 (a) (i) $700.00 None (New Item)
603. Operation and monitoring — no emergency response procedures 9.8.1 (a) (ii) $700.00 None (New Item)
604. Operation and monitoring — no procedures re performance of maintenance functions 9.8.1 (a) (iii) $700.00 None (New Item)
605. Operation and monitoring — fail to comply with operating and maintenance procedures 9.8.1 (b) $700.00 None (New Item)
606. Operation and monitoring — fail to keep records necessary to administer operating and maintenance procedures 9.8.1 (c) $700.00 None (New Item)
607. Operation and monitoring — fail to ensure staff are trained 9.8.1 (d) $700.00 None (New Item)
608. Operation and monitoring — fail to update operating and maintenance procedures as required 9.8.1 (e) $700.00 None (New Item)
609. Operating and monitoring — fail to limit the maximum injection and withdrawal rates 9.8.1 (f) $700.00 None (New Item)
610. Operating and monitoring — fail to maintain documents for activities on wells and pipelines 9.8.1 (g) (i) $400.00 None (New Item)
611. Operating and monitoring — fail to maintain documents for downhole activities and copies of all logs 9.8.1 (g) (ii) $400.00 None (New Item)
612. Operating and monitoring — fail to keep daily records of water injected and brine recovered 9.8.1 (h) (i) $400.00 None (New Item)
613. Operating and monitoring — fail to keep daily records of volume and pressure of blanketing material 9.8.1 (h) (ii) $400.00 None (New Item)
613.1 Fail to conduct mechanical integrity testing as required 9.8.2 (a) N.S.F. None (New Item)
614. Fail to provide for an Examiner to certify the mechanical integrity of each well 9.8.2 (b) $750.00 None (New Item)
615. Fail to monitor hydraulic closure and provide Examiner certification annually 9.8.3 $750.00 None (New Item)
615.1 Fail to conduct sonar survey 9.8.4 (a) N.S.F. None (New Item)
616. Fail to plot the results of the sonar survey 9.8.4 (b) $500.00 None (New Item)
616.1 Fail to use sonar survey to ensure solution mining is in accordance with mining plan 9.8.4 (c) N.S.F. None (New Item)
617. Fail to conduct subsidence monitoring annually using a qualified surveyor 9.8.5 (a) $550.00 None (New Item)
618. Fail to properly record the subsidence data and submit to Ministry 9.8.5 (b) $550.00 None (New Item)
619. Fail to comply with well servicing requirements 9.8.6 $750.00 None (New Item)
620. Abandonment — fail to include a sonar survey on the cavern 9.9 (a) $750.00 None (New Item)
621. Abandonment — fail to include a mechanical test on the casing 9.9 (b) $750.00 None (New Item)
621.1 Fail to plug solution mining well 9.9 (c) N.S.F. None (New Item)
621.2 Fail to comply with CSA Standard Z341-98 Storage of Hydrocarbons in Underground Formations 10 N.S.F. None (New Item)
622. Hydrocarbon storage — fail to have Examiner validate mechanical integrity test 10.1 $750.00 None (New Item)
623. Hydrocarbon storage — fail to conduct annual examination of surface works certified by Examiner 10.2 $750.00 None (New Item)
624. Fail to notify the Ministry of well overhauls 10.3 (a) (i) $700.00 None (New Item)
625. Fail to notify the Ministry of a change of service in a cavern 10.3 (a) (ii) $700.00 None (New Item)
626. Fail to notify the Ministry of damage or leak at well head or casing 10.3 (a) (iii) $700.00 None (New Item)
627. Fail to notify the Ministry of emergency 10.3 (b) $700.00 None (New Item)
628. Fail to ensure protection of oil or gas producing horizons 11 (a) $700.00 None (New Item)
629. Fail to prevent the migration of oil, gas or water 11 (b) $700.00 None (New Item)
630. Fail to seal off and isolate all porous formations 11 (c) $700.00 None (New Item)
631. Fail to ensure plugging does not constitute a hazard to surface users 11 (d) $700.00 None (New Item)
632. Fail to plug hydrocarbon storage wells in accordance with CSA Z341-98 11.1 (a) $700.00 None (New Item)
633. Fail to plug in accordance with section 9.9 of the Standards 11.1 (b) $700.00 None (New Item)
634. Fail to properly remove casing, tubing and material from well 11.2. $500.00 None (New Item)
635. Fail to use neat cement 11.3 (a) (i) $500.00 None (New Item)
636. Fail to mix cement in accordance with API Specifications 11.3 (a) (ii) $500.00 None (New Item)
637. Fail to make cement plug in the form of a water base slurry 11.3 (a) (iii) $500.00 None (New Item)
638. Fail to make cement plug sulphate resistant 11.3 (a) (iv) $500.00 None (New Item)
639. Fail to make bridges of wood, stone, gravel or lead 11.3 (b) $500.00 None (New Item)
640. Fail to deposit cement plug by displacement or dump bailer 11.4 $500.00 None (New Item)
641. Fail to ensure pumped cement plugs have sufficient slurry volume 11.5 (a) $500.00 None (New Item)
642. Fail to ensure dump-bailed plugs have sufficient volume 11.5 (b) $500.00 None (New Item)
643. Fail to locate plug at top of each zone or salt cavern and certify location 11.6 (a) $500.00 None (New Item)
644. Fail to locate the top most plug set in the well and certify location 11.6 (b) $500.00 None (New Item)
645. Fail to fill area between plugs with water or drilling mud 11.7 $500.00 None (New Item)
646. Fail to set cement plugs above and below each oil, gas and fluid bearing zone 11.8 (a) $500.00 None (New Item)
647. Fail to set cement plugs at top of formations 11.8 (b) $500.00 None (New Item)
648. Fail to extend plugs 8 metres in the well 11.9 $500.00 None (New Item)
649. Fail to properly recover casing when surface casing is left in hole 11.10 (a) $500.00 None (New Item)
650. Fail to properly recover casing when surface casing is removed 11.10 (b) $500.00 None (New Item)
651. Fail to place a cement plug 15 metres below zone and 15 metres above top of zone 11.10 (c) $700.00 None (New Item)
652. Fail to set plug across shoe of surface casing 11.11 (a) $700.00 None (New Item)
653. Fail to place plug inside the surface casing 11.11 (b) $700.00 None (New Item)
654. Fail to place plug inside casing below the base where intermediate casing cemented 11.11 (c) $700.00 None (New Item)
655. Fail to place plug across the shoe where intermediate casing to be left 11.11 (d) $700.00 None (New Item)
656. Fail to recover casing to allow placement of plugs where intermediate casing not cemented 11.11 (e) $700.00 None (New Item)
657. Fail to place plug inside casing below the base where production casing cemented 11.11 (f) $700.00 None (New Item)
658. Fail to recover casing to allow placement of plug where production casing not cemented 11.11 (g) $700.00 None (New Item)
659. Fail to set 8 metre plug at top of productive zone 11.11 (h) $700.00 None (New Item)
660. Rehabilitation — onshore well — fail to dispose of all waste 11.13 (a) $700.00 None (New Item)
661. Rehabilitation — onshore well — fail to clear the area of all debris 11.13 (b) $700.00 None (New Item)
662. Rehabilitation — onshore well — fail to drain and fill excavations 11.13 (c) $700.00 None (New Item)
663. Rehabilitation — onshore well — fail to remove all surface works 11.13 (d) $700.00 None (New Item)
664. Rehabilitation — onshore well — fail to level and restore original grade of the site 11.13 (e) $700.00 None (New Item)
665. Rehabilitation — water covered area — fail to cut off any casing in water covered site 11.13.1 $750.00 None (New Item)
666. Rehabilitation — fail to record and submit Form 10 for every plugged well 11.14 $400.00 None (New Item)
667. Fail to calculate using proper rates 12 (a) $450.00 None (New Item)
668. Fail to make fee payment 12 (b) $450.00 None (New Item)
669. Fail to submit Form 7 with fee payment 12 (c) $450.00 None (New Item)
670. Drilling activity notice — fail to notify Ministry 48 hours prior to drilling 13.2 (a) $400.00 None (New Item)
671. Drilling activity notice — fail to notify Ministry of drilling suspension date within 48 hours 13.2 (b) (i) $400.00 None (New Item)
672. Drilling activity notice — fail to notify Ministry of well depth within 48 hours 13.2 (b) (ii) $400.00 None (New Item)
673. Drilling activity notice — fail to notify Ministry of well condition within 48 hours 13.2 (b) (iii) $400.00 None (New Item)
674. Drilling activity notice — fail to notify Ministry of total depth and status of well within 48 hours of TD date 13.2 (c) $400.00 None (New Item)
675. Drilling activity notice — fail to notify Ministry of  completion date and well status within 48 hours 13.2 (d) $400.00 None (New Item)
676. Drilling activity notice — fail to notify the Ministry 48 hours prior to plugging a well 13.2 (e) $400.00 None (New Item)
676.1 Fail to report emergency notification in writing 13.3 N.S.F. None (New Item)
677. Fail to complete a Drilling and Completion Report in Form 7 within 60 days of end of operation 13.4 $400.00 None (New Item)
678. Fail to deliver drilling samples within 30 days 13.5 $400.00 None (New Item)
679. Fail to properly pack and label drill cores 13.6 (a) $400.00 None (New Item)
680. Fail to submit core or other analysis to Ministry within 30 days of completion 13.6.1 $400.00 None (New Item)
681. Fail to ensure no core is destroyed 13.7 (a) $400.00 None (New Item)
682. Fail to ensure cores are delivered to library within 1 year of TD date 13.7 (b) $400.00 None (New Item)
683. Fail to supply logs or surveys to the Ministry within 30 days 13.8 $400.00 None (New Item)
684. Fail to complete Form 7 within 30 days of any well activities other than drilling or deepening 13.9 $400.00 None (New Item)
685. Fail to submit connate water determinations within 30 days 13.10 (a) $400.00 None (New Item)
686. Fail to submit copies of drill stem and production test within 30 days 13.10 (b) $400.00 None (New Item)
687. Fail to submit static hole pressure measurements within 30 days 13.10 (c) $400.00 None (New Item)
688. Fail to submit pressure measurements and back pressure tests within 30 days 13.10 (d) $400.00 None (New Item)
689. Fail to submit gas ratios within 30 days 13.10 (e) (i) $400.00 None (New Item)
690. Fail to submit liquid phase volumes within 30 days 13.10 (e) (ii) $400.00 None (New Item)
691. Fail to submit formation volume factors within 30 days 13.10 (e) (iii) $400.00 None (New Item)
692. Fail to submit tank oil gravities within 30 days 13.10 (e) (iv) $400.00 None (New Item)
693. Fail to submit separator and stock tank gas-oil ratios within 30 days 13.10 (e) (v) $400.00 None (New Item)
694. Fail to submit bubble point pressure of reservoir fluid within 30 days 13.10 (e) (vi) $400.00 None (New Item)
695. Fail to submit compressibility of saturated reservoir oil within 30 days 13.10 (e) (vii) $400.00 None (New Item)
696. Fail to submit viscosity of reservoir oil within 30 days 13.10 (e) (viii) $400.00 None (New Item)
697. Fail to submit fractional analysis of casing head gas and reservoir fluid within 30 days 13.10 (e) (ix) $400.00 None (New Item)
698. Fail to submit Annual Production Report of Monthly Well or Field/Pool Production by February 15 13.11 $400.00 None (New Item)
699. Fail to submit an Annual Report on Monthly Injection by February 15 13.12 $400.00 None (New Item)
700. Disposal well — fail to submit records of pressure measurements and tests within 30 days 13.13 (a) (i) $400.00 None (New Item)
701. Disposal well — fail to submit copies of chemical analysis from water wells within 30 days 13.13 (a) (ii) $400.00 None (New Item)
702. Disposal well — fail to submit the mechanical integrity test within 30 days 13.13 (a) (iii) $400.00 None (New Item)
703. Disposal well — fail to submit an Annual Subsurface Fluid Disposal Report by February 15 13.13 (b) $400.00 None (New Item)
704. Disposal well — fail to submit a Plugging of a Well Report within 30 days 13.14 $400.00 None (New Item)
705. Disposal well — fail to submit an Annual Report of Geophysical/Agrochemical Activity by February 15 13.15 $400.00 None (New Item)
706. Annual well status report — fail to show all the wells 13.16 (a) $400.00 None (New Item)
707. Annual well status report — fail to show the status of each well 13.16 (b) $400.00 None (New Item)
708. Annual well status report — fail to show calculation of well licence fee 13.16 (c) $400.00 None (New Item)
709. Annual well status report — not accompanied by licence fee 13.16 (d) $400.00 None (New Item)
710. Third party gas report — fail to submit by February 15 13.16 $400.00 None (New Item)
711. Fail to submit completed third party gas report 13.17 $700.00 None (New Item)
712. Fail to submit completed third party oil report 13.18 $700.00 None (New Item)
722. Fail to submit the Initial Production Test Period Report within 10 days 13.19 $400.00 None (New Item)
723. Fail to report voluntarily unitized unit area and required information 13.20 $400.00 None (New Item)
724. Fail to report voluntarily amended unit area required information 13.21 $400.00 None (New Item)
736. Fail to submit an Annual Report of Solution Mined Salt Production by February 15 13.22 $400.00 None (New Item)
737. Salt solution mining — fail to submit results of all tests within 30 days 13.23 $400.00 None (New Item)
737.1 Fail to immediately contact Ministry in case of spill or subsidence occurrence 13.24 N.S.F. None (New Item)
738. Underground storage tanks — fail to construct a dike surrounding the tank 14.2 (a) $700.00 None (New Item)
739. Underground storage tanks — fail to construct cover to prevent access 14.2 (b) (i) $400.00 None (New Item)
740. Underground storage tanks — fail to construct chain link fence to prevent access 14.2 (b) (ii) $700.00 None (New Item)
741. Underground storage tanks — fail to install a ladder inside the tank 14.2 (c) $700.00 None (New Item)
742. Underground storage tanks — fail to install a warning sign on the fence or cover 14.2 (d) $400.00 None (New Item)
743. Oil field fluid storage — fail to ensure fluid cannot create a hazard 14.3 (a) $700.00 None (New Item)
744. Oil field fluid storage — fail to ensure the storage area does not leak 14.3 (b) $700.00 None (New Item)
745. Oil field fluid storage — fail to construct a chain link fence around storage area 14.3 (c) $700.00 None (New Item)
746. Oil field fluid storage — fail to ensure all gates on fence are closed and locked 14.3 (d) $400.00 None (New Item)
747. Oil field fluid storage — fail to install prominent warning signs 14.3 (e) $400.00 None (New Item)
748. Oil field fluid storage — fail to install a ladder 14.3 (f) $700.00 None (New Item)
749. Oil field fluid storage — fail to install life-saving rescue equipment 14.3 (g) $700.00 None (New Item)
750. Fail to install a valve and piping on well before being serviced 14.4 $400.00 None (New Item)
751. Fail to cap a suspended well 14.5 (a) $400.00 None (New Item)
752. Fail to mark the site with well name 14.5 (b) $450.00 None (New Item)
753. Fail to plug the well when capable of flow to surface 14.5 (c) $700.00 None (New Item)
Ontario Court of Justice